{"id":13128,"date":"2023-09-12T09:35:11","date_gmt":"2023-09-12T09:35:11","guid":{"rendered":"https:\/\/primeconstruction.gr\/civil-engineering-services\/regulation-of-arbitrary-and-semi-outdoor-spaces\/"},"modified":"2023-10-17T13:01:38","modified_gmt":"2023-10-17T13:01:38","slug":"regulation-of-arbitrary-and-semi-outdoor-spaces","status":"publish","type":"page","link":"https:\/\/primeconstruction.gr\/en\/civil-engineering-services\/regulation-of-arbitrary-and-semi-outdoor-spaces\/","title":{"rendered":"Regulation of Arbitrary and Semi-Outdoor Spaces"},"content":{"rendered":"\t\t<div data-elementor-type=\"wp-page\" data-elementor-id=\"13128\" class=\"elementor elementor-13128 elementor-11328\">\n\t\t\t\t\t\t<section class=\"wd-negative-gap elementor-section elementor-top-section elementor-element elementor-element-4740099 elementor-section-boxed elementor-section-height-default elementor-section-height-default wd-section-disabled\" data-id=\"4740099\" data-element_type=\"section\" data-e-type=\"section\">\n\t\t\t\t\t\t<div class=\"elementor-container elementor-column-gap-default\">\n\t\t\t\t\t<div class=\"elementor-column elementor-col-33 elementor-top-column elementor-element elementor-element-2d017ce\" data-id=\"2d017ce\" data-element_type=\"column\" data-e-type=\"column\">\n\t\t\t<div class=\"elementor-widget-wrap elementor-element-populated\">\n\t\t\t\t\t\t<div class=\"elementor-element elementor-element-9dd3cbd elementor-widget elementor-widget-wd_text_block\" data-id=\"9dd3cbd\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"wd_text_block.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t<link rel=\"stylesheet\" id=\"wd-text-block-css\" href=\"https:\/\/primeconstruction.gr\/wp-content\/themes\/woodmart\/css\/parts\/el-text-block.min.css?ver=7.0.4\" type=\"text\/css\" media=\"all\" \/> \t\t\t\t\t<div class=\"wd-text-block reset-last-child text-left color-primary\">\n\t\t\t\n\t\t\t<p>Regulation of Arbitrary and Semi-Outdoor Spaces<\/p>\n\t\t\t\t\t<\/div>\n\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-42e9e61 elementor-widget elementor-widget-wd_text_block\" data-id=\"42e9e61\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"wd_text_block.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t<div class=\"wd-text-block reset-last-child text-left\">\n\t\t\t\n\t\t\t<p><span style=\"color: #000000;\">Arbitrary settlement is the process where after the payment of the single special fine or the relevant fee only, the collection and imposition of any sanction is suspended for a time proportional to the category of the arbitrary construction or a definitive exemption from demolition occurs, for arbitrary constructions, arbitrary changes of use as well as for any urban planning and building violation that can be included in the new Law on Addressing Arbitrary Construction N.4495\/2017.<\/span><\/p><p><span style=\"color: #000000;\">We undertake the full implementation of all the required actions for the settlement - legalization of your arbitrariness, in accordance with existing legislation. After communication, an engineer from our office visits you for an autopsy and receipt of all the necessary supporting documents. Upon completion of the process on our part, we deliver you a complete settlement file of your arbitrariness.  <\/span><\/p>\n\t\t\t\t\t<\/div>\n\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t<\/div>\n\t\t\t\t<div class=\"elementor-column elementor-col-66 elementor-top-column elementor-element elementor-element-e18a0b6\" data-id=\"e18a0b6\" data-element_type=\"column\" data-e-type=\"column\">\n\t\t\t<div class=\"elementor-widget-wrap elementor-element-populated\">\n\t\t\t\t\t\t<div class=\"elementor-element elementor-element-56d8f19 elementor-widget elementor-widget-wd_image_or_svg\" data-id=\"56d8f19\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"wd_image_or_svg.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\n\t\t<div class=\"wd-image text-left\">\n\t\t\t\t\t\t\t\t<img fetchpriority=\"high\" decoding=\"async\" width=\"1000\" height=\"659\" src=\"https:\/\/primeconstruction.gr\/wp-content\/uploads\/2023\/09\/a4-e1506643073973.webp\" class=\"attachment-full size-full wp-image-11396\" alt=\"\" srcset=\"https:\/\/primeconstruction.gr\/wp-content\/uploads\/2023\/09\/a4-e1506643073973.webp 1000w, https:\/\/primeconstruction.gr\/wp-content\/uploads\/2023\/09\/a4-e1506643073973-400x264.webp 400w, https:\/\/primeconstruction.gr\/wp-content\/uploads\/2023\/09\/a4-e1506643073973-768x506.webp 768w\" sizes=\"(max-width: 1000px) 100vw, 1000px\" \/>\t\t\t\t\t<\/div>\n\n\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t<\/section>\n\t\t\t\t<section class=\"wd-negative-gap elementor-section elementor-top-section elementor-element elementor-element-d51a72f elementor-section-boxed elementor-section-height-default elementor-section-height-default wd-section-disabled\" data-id=\"d51a72f\" data-element_type=\"section\" data-e-type=\"section\">\n\t\t\t\t\t\t<div class=\"elementor-container elementor-column-gap-default\">\n\t\t\t\t\t<div class=\"elementor-column elementor-col-33 elementor-top-column elementor-element elementor-element-44f3870\" data-id=\"44f3870\" data-element_type=\"column\" data-e-type=\"column\">\n\t\t\t<div class=\"elementor-widget-wrap elementor-element-populated\">\n\t\t\t\t\t\t<div class=\"elementor-element elementor-element-adda716 elementor-widget elementor-widget-wd_sidebar\" data-id=\"adda716\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"wd_sidebar.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t<div id=\"nav_menu-23\" class=\"wd-widget widget sidebar-widget widget_nav_menu\"><div class=\"menu-services-sidebar-container\"><ul id=\"menu-services-sidebar\" class=\"menu\"><li id=\"menu-item-10492\" class=\"menu-item menu-item-type-custom menu-item-object-custom menu-item-has-children menu-item-10492\"><a href=\"#\">\u0391\u03bd\u03b1\u03ba\u03b1\u03b9\u03bd\u03af\u03c3\u03b5\u03b9\u03c2<\/a>\n<ul class=\"sub-menu\">\n\t<li id=\"menu-item-11516\" class=\"menu-item menu-item-type-post_type menu-item-object-page menu-item-11516\"><a href=\"https:\/\/primeconstruction.gr\/anakainiseis\/adeiodothsh-anakainiseis\/\">Renovation Permit<\/a><\/li>\n\t<li id=\"menu-item-10493\" class=\"menu-item menu-item-type-post_type menu-item-object-page menu-item-10493\"><a href=\"https:\/\/primeconstruction.gr\/anakainiseis\/anakainish-katoikias\/\">Home Renovation<\/a><\/li>\n\t<li id=\"menu-item-10561\" class=\"menu-item menu-item-type-post_type menu-item-object-page menu-item-10561\"><a href=\"https:\/\/primeconstruction.gr\/anakainiseis\/anakainisi-epangelmatikou-chorou\/\">Renovation of Professional Space<\/a><\/li>\n\t<li id=\"menu-item-10560\" class=\"menu-item menu-item-type-post_type menu-item-object-page menu-item-10560\"><a href=\"https:\/\/primeconstruction.gr\/anakainiseis\/anakainish-ktirioy\/\">Building Renovation<\/a><\/li>\n\t<li id=\"menu-item-10495\" class=\"menu-item menu-item-type-post_type menu-item-object-page menu-item-10495\"><a href=\"https:\/\/primeconstruction.gr\/anakainiseis\/anakainish-koyzinas\/\">Kitchen Renovation<\/a><\/li>\n\t<li id=\"menu-item-10494\" class=\"menu-item menu-item-type-post_type menu-item-object-page menu-item-10494\"><a href=\"https:\/\/primeconstruction.gr\/anakainiseis\/anakainish-mpanioy\/\">Bathroom Renovation<\/a><\/li>\n\t<li id=\"menu-item-10559\" class=\"menu-item menu-item-type-post_type menu-item-object-page menu-item-10559\"><a href=\"https:\/\/primeconstruction.gr\/anakainiseis\/loipes-anakainiseis\/\">Other Renovations<\/a><\/li>\n<\/ul>\n<\/li>\n<li id=\"menu-item-13288\" class=\"menu-item menu-item-type-post_type menu-item-object-page menu-item-13288\"><a href=\"https:\/\/primeconstruction.gr\/diaxeirish-ergwn\/\">Project Management<\/a><\/li>\n<li id=\"menu-item-13289\" class=\"menu-item menu-item-type-post_type menu-item-object-page menu-item-13289\"><a href=\"https:\/\/primeconstruction.gr\/epivlepsh-ergwn\/\">Supervision of works<\/a><\/li>\n<li id=\"menu-item-13290\" class=\"menu-item menu-item-type-post_type menu-item-object-page menu-item-13290\"><a href=\"https:\/\/primeconstruction.gr\/ergolavies\/\">Contracts<\/a><\/li>\n<li id=\"menu-item-13291\" class=\"menu-item menu-item-type-post_type menu-item-object-page menu-item-has-children menu-item-13291\"><a href=\"https:\/\/primeconstruction.gr\/yphresies-politikoy-mhxanikoy\/\">Civil Engineering Services<\/a>\n<ul class=\"sub-menu\">\n\t<li id=\"menu-item-13292\" class=\"menu-item menu-item-type-post_type menu-item-object-page menu-item-13292\"><a href=\"https:\/\/primeconstruction.gr\/yphresies-politikoy-mhxanikoy\/adeies-leitoyrgias-katasthmatwn\/\">Store Operating Licenses<\/a><\/li>\n\t<li id=\"menu-item-13293\" class=\"menu-item menu-item-type-post_type menu-item-object-page menu-item-13293\"><a href=\"https:\/\/primeconstruction.gr\/yphresies-politikoy-mhxanikoy\/architektonikes-meletes\/\">Architectural Studies<\/a><\/li>\n\t<li id=\"menu-item-13294\" class=\"menu-item menu-item-type-post_type menu-item-object-page menu-item-13294\"><a href=\"https:\/\/primeconstruction.gr\/yphresies-politikoy-mhxanikoy\/diakosmhsh-eswterikwn-xwrwn\/\">Interior Design<\/a><\/li>\n\t<li id=\"menu-item-13295\" class=\"menu-item menu-item-type-post_type menu-item-object-page menu-item-13295\"><a href=\"https:\/\/primeconstruction.gr\/yphresies-politikoy-mhxanikoy\/ekdosh-pistopoihtikoy-energeiakhs-apodoshs\/\">Issuance of Energy Performance Certificate<\/a><\/li>\n\t<li id=\"menu-item-13296\" class=\"menu-item menu-item-type-post_type menu-item-object-page menu-item-13296\"><a href=\"https:\/\/primeconstruction.gr\/yphresies-politikoy-mhxanikoy\/exoikonomish-kat-oikon\/\">Home Savings<\/a><\/li>\n\t<li id=\"menu-item-13297\" class=\"menu-item menu-item-type-post_type menu-item-object-page menu-item-13297\"><a href=\"https:\/\/primeconstruction.gr\/yphresies-politikoy-mhxanikoy\/ilektroniki-taftotita-ktiriou\/\">Electronic Building Identity<\/a><\/li>\n\t<li id=\"menu-item-13298\" class=\"menu-item menu-item-type-post_type menu-item-object-page menu-item-13298\"><a href=\"https:\/\/primeconstruction.gr\/yphresies-politikoy-mhxanikoy\/ktiriakes-kai-statikes-meletes\/\">Building and Static Studies<\/a><\/li>\n\t<li id=\"menu-item-13299\" class=\"menu-item menu-item-type-post_type menu-item-object-page menu-item-13299\"><a href=\"https:\/\/primeconstruction.gr\/yphresies-politikoy-mhxanikoy\/rythmish-aythairetwn-kai-hmiypaithriwn-xwrwn\/\">Regulation of Arbitrary and Semi-Outdoor Spaces<\/a><\/li>\n<\/ul>\n<\/li>\n<\/ul><\/div><\/div>\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t<\/div>\n\t\t\t\t<div class=\"elementor-column elementor-col-66 elementor-top-column elementor-element elementor-element-abcd192\" data-id=\"abcd192\" data-element_type=\"column\" data-e-type=\"column\" data-settings=\"{&quot;background_background&quot;:&quot;classic&quot;}\">\n\t\t\t<div class=\"elementor-widget-wrap elementor-element-populated\">\n\t\t\t\t\t\t<div class=\"elementor-element elementor-element-2931553 elementor-widget elementor-widget-wd_text_block\" data-id=\"2931553\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"wd_text_block.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t<div class=\"wd-text-block reset-last-child text-left color-primary\">\n\t\t\t\n\t\t\t<p>The 5 points of the process of joining the arbitrary regulation:<\/p>\n\t\t\t\t\t<\/div>\n\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-76ae0d5 elementor-widget elementor-widget-wd_text_block\" data-id=\"76ae0d5\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"wd_text_block.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t<div class=\"wd-text-block reset-last-child text-left\">\n\t\t\t\n\t\t\t<p><span style=\"color: #000000;\">1. The citizen addresses an engineer who has access to the electronic system of the TEE. The engineer carries out an autopsy, collects the information required to complete the regulatory application and calculates the \"provisional penalty\". <\/span><\/p><p><span style=\"color: #000000;\">2. The engineer completes and submits the application electronically, and the system issues a \"unique number\" for the arbitrary, order to pay the appropriate \"subscription fee\" to the regulation (toll), as well as the amount of payments in relation to the number of of installments to be selected.<\/span><\/p><p><span style=\"color: #000000;\">3. The fee is paid by the citizen (also electronically via web banking) to a Banking institution of his choice. The payment is automatically certified and the membership process is activated. The following are the installment payments for which the system is automatically informed. The citizen is given a code that will allow him to be informed about the registration of installments and the balance due until the completion of the process.   <\/span><\/p><p><span style=\"color: #000000;\">4. The required plans and other data are collected or drawn up. Based on these, the \"final fine\" is calculated and the amount of installments is redefined by the system.<\/span><\/p><p><span style=\"color: #000000;\">5. The engineer all the required elements and plans in the system electronically. Upon establishing that they are complete, an \"AUTHORIZED SETTLEMENT CERTIFICATE\" is automatically issued. This is a standardized form in which all the elements of the arbitrator included in the arrangement will be reported. The attestation is necessary for the transfer of ownership.   <\/span><\/p>\n\t\t\t\t\t<\/div>\n\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-60dc212 elementor-widget elementor-widget-wd_text_block\" data-id=\"60dc212\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"wd_text_block.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t<div class=\"wd-text-block reset-last-child text-left color-primary\">\n\t\t\t\n\t\t\t<p>Procedure for electronic submission of supporting documents:<\/p>\n\t\t\t\t\t<\/div>\n\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-183928b elementor-widget elementor-widget-wd_text_block\" data-id=\"183928b\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"wd_text_block.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t<div class=\"wd-text-block reset-last-child text-left\">\n\t\t\t\n\t\t\t<p>1. The engineer is obliged within six (6) months from the payment of the fee to complete the electronic submission of the necessary supporting documents.<\/p><p>2.a Until the completion of the submission of the supporting documents, it is possible to end the procedure, provided that the single special fine is paid and an electronic statement is submitted by the authorized engineer of par. 1 of article 1 of this decision that he has at his disposal all the supporting documents and the studies and will submit them electronically by the above deadline. If the above conditions are met, the certificate of par. 1a (par. iii) of article 3 of the Law is issued upon request.    4178\/2013.<\/p><p>b. For the implementation of par. 3 of article 3 of Law 4178\/2013, as copies of the plans from the information system, copies of the plans bearing the signature and seal of the Engineer are submitted and attached, on which the electronic code of the declaration of compliance with the provisions of Law 4178\/2013, extracted from the information system. In the event that the specific plans have not been submitted electronically to the information system in accordance with paragraph 1 of this article, the copies of the plans bear the Engineer's signature and seal, the electronic code of the declaration as well as the Engineer's declaration that he has at his disposal all supporting data and studies and will submit them electronically within the prescribed deadline.      <\/p><p>3. With the payment of the single special fine at a rate of at least 30%, if a statement is submitted electronically by the authorized engineer of par. 1 of article 2 that he has all supporting documents and studies at his disposal and will submit them electronically within the above deadline, the special certificate of par. 1a (par. iii) of article 3 of Law 4178\/2013. In the technical report accompanying the certificate, a clear reference is made to the payment of 30% of the single special fine pursuant to par.     1b of the same article. For the implementation of paragraph 3 of article 3 of Law 4178\/2013, as copies of the plans from the information system, copies of the plans bearing the Engineer's signature and seal, which contain the electronic code of the declaration of compliance with the provisions of the Law, are submitted and attached. 4178\/2013 which is extracted from the information system. In the event that the specific plans have not been submitted electronically to the information system in accordance with paragraph 1 of this article, the copies of the plans bear the Engineer's signature and seal, the electronic code of the statement as well as the Engineer's statement that has all the supporting data and studies at his disposal and will submit them electronically within the prescribed deadline.      <\/p><p>4. The electronic code of the declaration of compliance with the provisions of Law 4178\/2013, extracted from the information system, is written on the supporting documents and plans delivered by the responsible engineer to the owner, attached to the contracts or submitted for the issuance of administrative acts.  In the event that these supporting documents have not yet been entered into the system, they will be accompanied by a responsible declaration by the engineer that they are identical to those that will be entered in electronic form. The supporting documents at the time of their validity as well as the plans according to this article, if they are attached to legal acts, may be validated by a notary public according to the provisions of the text in order to be attached to subsequent acts. <\/p><p>5. From the entry into force of this, the overall affiliation process (joining, termination) is processed<\/p><p>exclusively electronically. In particular, for the drawing up of notarial documents with the object of transferring or establishing a real right to any property, including undeveloped plots, fields and plots of land, the certificate of article 3 of Law 4178\/2013 which is attached to the notarial documents, is issued in any case through the information system of N.   4178\/2013.<\/p><p>6. For the implementation of the provision of par. 8 of article 11 of Law 4178\/2013 regarding the submission or not of the static adequacy study, where required, special mention is made in each certificate of incorporation and in the certificate of par. 1a (about iii) of article 3 of Law 4178\/2013 for transfer.     The report on the certification for the submission or non-submission of a static adequacy study is entered by the authorized Engineer in the Technical Report that accompanies the issuance of the certification of par. 1a (par. iii) of article 3 of Law 4178\/2013. In any case, if a static adequacy study is not submitted, it is expressly stated that the static adequacy study must be submitted before completing the identity of the building according to the provisions.    The special mention on the affiliation certificate is registered after the activation of the relevant electronic procedure according to par. 6 of article 4 hereof. The special mention on the technical report that accompanies the certification of par. 1a (par. iii) of article 3 of Law 4178\/2013, where required, is registered from the entry into force of this.    <\/p>\n\t\t\t\t\t<\/div>\n\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t<\/section>\n\t\t\t\t<section class=\"wd-negative-gap elementor-section elementor-top-section elementor-element elementor-element-a8bab9c elementor-section-boxed elementor-section-height-default elementor-section-height-default wd-section-disabled\" data-id=\"a8bab9c\" data-element_type=\"section\" data-e-type=\"section\">\n\t\t\t\t\t\t<div class=\"elementor-container elementor-column-gap-default\">\n\t\t\t\t\t<div class=\"elementor-column elementor-col-100 elementor-top-column elementor-element elementor-element-261acd7\" data-id=\"261acd7\" data-element_type=\"column\" data-e-type=\"column\">\n\t\t\t<div class=\"elementor-widget-wrap\">\n\t\t\t\t\t\t\t<\/div>\n\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t<\/section>\n\t\t\t\t<\/div>\n\t\t","protected":false},"excerpt":{"rendered":"<p>Regulation of Arbitrary and Semi-Outdoor Spaces Arbitrary settlement is the process where after the payment of the single special fine<\/p>\n","protected":false},"author":1,"featured_media":0,"parent":13106,"menu_order":27,"comment_status":"closed","ping_status":"closed","template":"","meta":{"footnotes":""},"class_list":["post-13128","page","type-page","status-publish","hentry"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.5 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Regulation of Arbitrary and Semi-Outdoor Spaces - Prime Construction<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/primeconstruction.gr\/en\/civil-engineering-services\/regulation-of-arbitrary-and-semi-outdoor-spaces\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Regulation of Arbitrary and Semi-Outdoor Spaces - Prime Construction\" \/>\n<meta property=\"og:description\" content=\"Regulation of Arbitrary and Semi-Outdoor Spaces Arbitrary settlement is the process where after the payment of the single special fine\" \/>\n<meta property=\"og:url\" content=\"https:\/\/primeconstruction.gr\/en\/civil-engineering-services\/regulation-of-arbitrary-and-semi-outdoor-spaces\/\" \/>\n<meta property=\"og:site_name\" content=\"Prime Construction\" \/>\n<meta property=\"article:modified_time\" content=\"2023-10-17T13:01:38+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/primeconstruction.gr\/wp-content\/uploads\/2023\/09\/a4-e1506643073973.webp\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"8 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/primeconstruction.gr\\\/en\\\/civil-engineering-services\\\/regulation-of-arbitrary-and-semi-outdoor-spaces\\\/\",\"url\":\"https:\\\/\\\/primeconstruction.gr\\\/en\\\/civil-engineering-services\\\/regulation-of-arbitrary-and-semi-outdoor-spaces\\\/\",\"name\":\"Regulation of Arbitrary and Semi-Outdoor Spaces - Prime Construction\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/primeconstruction.gr\\\/en\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/primeconstruction.gr\\\/en\\\/civil-engineering-services\\\/regulation-of-arbitrary-and-semi-outdoor-spaces\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/primeconstruction.gr\\\/en\\\/civil-engineering-services\\\/regulation-of-arbitrary-and-semi-outdoor-spaces\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/primeconstruction.gr\\\/wp-content\\\/uploads\\\/2023\\\/09\\\/a4-e1506643073973.webp\",\"datePublished\":\"2023-09-12T09:35:11+00:00\",\"dateModified\":\"2023-10-17T13:01:38+00:00\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/primeconstruction.gr\\\/en\\\/civil-engineering-services\\\/regulation-of-arbitrary-and-semi-outdoor-spaces\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/primeconstruction.gr\\\/en\\\/civil-engineering-services\\\/regulation-of-arbitrary-and-semi-outdoor-spaces\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/primeconstruction.gr\\\/en\\\/civil-engineering-services\\\/regulation-of-arbitrary-and-semi-outdoor-spaces\\\/#primaryimage\",\"url\":\"https:\\\/\\\/primeconstruction.gr\\\/wp-content\\\/uploads\\\/2023\\\/09\\\/a4-e1506643073973.webp\",\"contentUrl\":\"https:\\\/\\\/primeconstruction.gr\\\/wp-content\\\/uploads\\\/2023\\\/09\\\/a4-e1506643073973.webp\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/primeconstruction.gr\\\/en\\\/civil-engineering-services\\\/regulation-of-arbitrary-and-semi-outdoor-spaces\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"\u0391\u03c1\u03c7\u03b9\u03ba\u03ae\",\"item\":\"https:\\\/\\\/primeconstruction.gr\\\/en\\\/home\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Civil Engineering Services\",\"item\":\"https:\\\/\\\/primeconstruction.gr\\\/en\\\/civil-engineering-services\\\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"Regulation of Arbitrary and Semi-Outdoor Spaces\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/primeconstruction.gr\\\/en\\\/#website\",\"url\":\"https:\\\/\\\/primeconstruction.gr\\\/en\\\/\",\"name\":\"Prime Construction\",\"description\":\"\u0391\u03bd\u03b1\u03ba\u03b1\u03b9\u03bd\u03af\u03c3\u03b5\u03b9\u03c2-\u03a5\u03c0\u03b7\u03c1\u03b5\u03c3\u03af\u03b5\u03c2 \u03a0\u03bf\u03bb\u03b9\u03c4\u03b9\u03ba\u03bf\u03cd \u039c\u03b7\u03c7\u03b1\u03bd\u03b9\u03ba\u03bf\u03cd\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/primeconstruction.gr\\\/en\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Regulation of Arbitrary and Semi-Outdoor Spaces - Prime Construction","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/primeconstruction.gr\/en\/civil-engineering-services\/regulation-of-arbitrary-and-semi-outdoor-spaces\/","og_locale":"en_US","og_type":"article","og_title":"Regulation of Arbitrary and Semi-Outdoor Spaces - Prime Construction","og_description":"Regulation of Arbitrary and Semi-Outdoor Spaces Arbitrary settlement is the process where after the payment of the single special fine","og_url":"https:\/\/primeconstruction.gr\/en\/civil-engineering-services\/regulation-of-arbitrary-and-semi-outdoor-spaces\/","og_site_name":"Prime Construction","article_modified_time":"2023-10-17T13:01:38+00:00","og_image":[{"url":"https:\/\/primeconstruction.gr\/wp-content\/uploads\/2023\/09\/a4-e1506643073973.webp","type":"","width":"","height":""}],"twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"8 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/primeconstruction.gr\/en\/civil-engineering-services\/regulation-of-arbitrary-and-semi-outdoor-spaces\/","url":"https:\/\/primeconstruction.gr\/en\/civil-engineering-services\/regulation-of-arbitrary-and-semi-outdoor-spaces\/","name":"Regulation of Arbitrary and Semi-Outdoor Spaces - Prime Construction","isPartOf":{"@id":"https:\/\/primeconstruction.gr\/en\/#website"},"primaryImageOfPage":{"@id":"https:\/\/primeconstruction.gr\/en\/civil-engineering-services\/regulation-of-arbitrary-and-semi-outdoor-spaces\/#primaryimage"},"image":{"@id":"https:\/\/primeconstruction.gr\/en\/civil-engineering-services\/regulation-of-arbitrary-and-semi-outdoor-spaces\/#primaryimage"},"thumbnailUrl":"https:\/\/primeconstruction.gr\/wp-content\/uploads\/2023\/09\/a4-e1506643073973.webp","datePublished":"2023-09-12T09:35:11+00:00","dateModified":"2023-10-17T13:01:38+00:00","breadcrumb":{"@id":"https:\/\/primeconstruction.gr\/en\/civil-engineering-services\/regulation-of-arbitrary-and-semi-outdoor-spaces\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/primeconstruction.gr\/en\/civil-engineering-services\/regulation-of-arbitrary-and-semi-outdoor-spaces\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/primeconstruction.gr\/en\/civil-engineering-services\/regulation-of-arbitrary-and-semi-outdoor-spaces\/#primaryimage","url":"https:\/\/primeconstruction.gr\/wp-content\/uploads\/2023\/09\/a4-e1506643073973.webp","contentUrl":"https:\/\/primeconstruction.gr\/wp-content\/uploads\/2023\/09\/a4-e1506643073973.webp"},{"@type":"BreadcrumbList","@id":"https:\/\/primeconstruction.gr\/en\/civil-engineering-services\/regulation-of-arbitrary-and-semi-outdoor-spaces\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"\u0391\u03c1\u03c7\u03b9\u03ba\u03ae","item":"https:\/\/primeconstruction.gr\/en\/home\/"},{"@type":"ListItem","position":2,"name":"Civil Engineering Services","item":"https:\/\/primeconstruction.gr\/en\/civil-engineering-services\/"},{"@type":"ListItem","position":3,"name":"Regulation of Arbitrary and Semi-Outdoor Spaces"}]},{"@type":"WebSite","@id":"https:\/\/primeconstruction.gr\/en\/#website","url":"https:\/\/primeconstruction.gr\/en\/","name":"Prime Construction","description":"\u0391\u03bd\u03b1\u03ba\u03b1\u03b9\u03bd\u03af\u03c3\u03b5\u03b9\u03c2-\u03a5\u03c0\u03b7\u03c1\u03b5\u03c3\u03af\u03b5\u03c2 \u03a0\u03bf\u03bb\u03b9\u03c4\u03b9\u03ba\u03bf\u03cd \u039c\u03b7\u03c7\u03b1\u03bd\u03b9\u03ba\u03bf\u03cd","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/primeconstruction.gr\/en\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"}]}},"_links":{"self":[{"href":"https:\/\/primeconstruction.gr\/en\/wp-json\/wp\/v2\/pages\/13128","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/primeconstruction.gr\/en\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/primeconstruction.gr\/en\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/primeconstruction.gr\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/primeconstruction.gr\/en\/wp-json\/wp\/v2\/comments?post=13128"}],"version-history":[{"count":2,"href":"https:\/\/primeconstruction.gr\/en\/wp-json\/wp\/v2\/pages\/13128\/revisions"}],"predecessor-version":[{"id":13174,"href":"https:\/\/primeconstruction.gr\/en\/wp-json\/wp\/v2\/pages\/13128\/revisions\/13174"}],"up":[{"embeddable":true,"href":"https:\/\/primeconstruction.gr\/en\/wp-json\/wp\/v2\/pages\/13106"}],"wp:attachment":[{"href":"https:\/\/primeconstruction.gr\/en\/wp-json\/wp\/v2\/media?parent=13128"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}